History & Milestone

2009

Founded
2009

2012

Developed and produced Fixed-Tilt structures
2012

2013

Changzhou manufacturing base entered production
Started overseas business
2013

2014

Launched the first solar tracker: Arctracker Pro
Set up Shanghai branch
Selected as a China’s high-tech enterprise
2014

2016

Set up global R&D center
Top 1 solar tracking and racking solutions supplier worldwide
10GW milestone (Fixed + Tracker)
Developed C&I BIPV solutions
2016

2017

Top 4 solar tracker supplier worldwide for the first time
 
Completed the Jiangsu Province Intelligent Solar Tracker Engineering Technology Research Center
 
Established Jiangsu Province Postdoctoral Innovation and Practicing Base
2017

2018

Top 1 solar tracker supplier in the APAC for the first time
 
Set up an R&D center in Spain
 
Selected as the manufacturing demonstration enterprise of Jiangsu Province
 
Set up a workstation for graduate students in Jiangsu Province
2018

2019

Pioneered synchronous multi-point drive mechanism
 
Signed a 1.3GW solar tracker supply deal in Qinghai, China
2019

2020

IPO on China’s STAR market (688408)
Set up 16 service branches around the globe
Signed a 1.7GW solar tracker supply deal in India
2020

2021

Launched the world’s first PV company-owned Wind Tunnel Laboratory
 
Fanchang manufacturing base entered production
 
Co-built the academician workstation of Jiangsu Province with Shen Xuechu, Academician of the Chinese Academy of Sciences
 
Selected as a China’s Intelligent PV Demonstration Pilot Enterprise
 
Signed a 2.1GW solar tracker supply deal in Abu Dhabi
 
Obtained the largest BIPV project in China
2021

2022

Top 1 solar tracker supplier in MEA for the first time
 
Indian JV factory entered operation
 
Susong manufacturing base for flexible PV mounting system entered operation
 
Established computing wind engineering CDF analysis center
 
Signed a 2.8GW solar tracker supply deal in India
 
Accumulated shipment of solar trackers and fixed-tilt structures exceeded 55GW
2022

2023

Launched the world’s first “3D Geographic Information System GIS+ numerical wind tunnel CFD simulation” application technology
 
Signed a 1.7GW solar tracker supply deal in Saudi Arabia
 
Obtained the Uzbekistan 1GW solar tracker project
 
Accumulated shipment of solar trackers and fixed-tilt structures exceeded 68GW
2023

2024

Strategic release – “Tracking Plus”
 
Completion of production bases in Brazil and Saudi Arabia
 
Top 3 in brand value of global tracking system by PVBL
2024